🏗️

Latest Construction Tenders in Federal

Active construction procurement notices in Federal, Pakistan

67tenders
🏗️

TLC-29-2026: Construction and Completion of Civil Works, Erection, Stringing, Testing & Commissioning of 220kV D/C Transmission Lines from Mohmand Dam HPP to 500/220/132kV Sheikh Muhammadi S/S

14 days left

lahore·Ministry of Energy (Power Division)

WorksPosted 30-Jun-2026PPRA FederalCloses 20-Jul-2026
🏗️

TLC-26-2025 REHABILITATION WORKS OF 220KV DOUBLE CIRCUIT SINGLE CONDUCTOR SIBBI–QUETTA TRANSMISSION LINE (APPROX. 03 KM)

8 days left

lahore·Ministry of Energy (Power Division)

WorksPosted 29-Jun-2026PPRA FederalCloses 14-Jul-2026
🏗️

Construction of Hyderabad – Sukkur Motorway (M-6); Section– 3: Nawabshah to Naushahro Feroz (Km 250+500 to Km 315+300) [64.61 km approximately]

Active

islamabad·Ministry of Communications

WorksPosted 29-Jun-2026PPRA FederalCloses 11-Aug-2026
🏗️

Reconstruction of National Highway N-5 under Pakistan’s Resilient Recovery, Rehabilitation and Reconstruction Framework Project–Phase I-A (141 KM), Section-2: Ranipur–Rohri Road (70 KM) Loan No: L0913-A. Tender No. IOCT/N-5/Phase I-A/Section-2.

14 days left

islamabad·Ministry of Communications

WorksPosted 27-Jun-2026PPRA FederalCloses 20-Jul-2026
🏗️

Procurement, Supply, Installation, Integration, Configuration, Testing, Commissioning, and Support of Dashboard Visualization, Video Wall, and Enterprise Virtual Desktop Infrastructure (VDI) Solutions

4 days left

islamabad·Ministry of Finance

WorksPosted 25-Jun-2026PPRA FederalCloses 10-Jul-2026
🏗️

Renovation of First Floor of Main Building at Gas Metering & Calibration Facility (GM & CF) at Karachi Terminal (as per BOQ/T/C) (Having Valid PEC Certificate Category C-6 or above with Subcategory CE-10) (Under Single Stage Two Envelope Bidding Procedure)(On Complete Package Basis)

7 days left

karachi·Ministry of Energy (Petroleum Division)

ServicesPosted 24-Jun-2026PPRA FederalCloses 13-Jul-2026
🏗️

Up gradation of 08 MGD TO 12 MGD Pretabad Water Treatment Plant, Providing & Fixing of Solar Lights at various streets & Solarization of schools & Colleges of Taluka City, Hyderabad. , Providing and Laying Main (20" dia) Water Supply Line from Pretabad Filter Plant to Hali Road, Up Gradation of Various Roads & Streets, Strom Water Drains, & Water Supply Lines of Taluka City, Hyderabad (5 Schemes)

Active

karachi·Ministry of Housing & Works

WorksPosted 24-Jun-2026PPRA FederalCloses 30-Jul-2026
🏗️

UPGRADATION OF NATIONAL BANK STADIUM, KARACHI (PHASE-1) - CONSTRUCTION OF REPROFILING & MOAT WORKS

7 days left

lahore·Pakistan Cricket Board

WorksPosted 24-Jun-2026PPRA FederalCloses 13-Jul-2026
🏗️

CC. Tuff Paver Road, Sewerage Line, Open Drain & Water supply line, Pedestrian Bridge, 02 Nos. LSR & HSR at Water Pumping Stations roviding & Fixing / Installation of Solar Lights at Latifabad, Hyderabad (6 Schemes)

Active

karachi·Ministry of Housing & Works

WorksPosted 24-Jun-2026PPRA FederalCloses 30-Jul-2026
🏗️

TLC-18(R)-2026: Construction and completion of Civil Works, Erection, Stringing, Testing & Commissioning of 500kV D/C Quad Bundle Transmission Line from Sangal to 500kV Maira Switching Station, using ACSR “Bunting” Conductor Lot-I: 500kV Double Circuit Quad Bundle Transmission Line from Tower No. 01 Near Sangal to Tower No. 69 Near Potha Sharif (23.5 km)

9 days left

lahore·Ministry of Energy (Power Division)

WorksPosted 24-Jun-2026PPRA FederalCloses 15-Jul-2026
🏗️

Procurement of Infrastructure and Maintenance Services for Two Wheeler Battery Swapping Pilot Project

Active

karachi·Pakistan State Oil (PSO)

GoodsPosted 24-Jun-2026PPRA FederalCloses 27-Jul-2026
🏗️

320-Disposal of Old Unserviceable and Out of Order Engineering Items at Scrapyard of SBP BSC North Nazimabad, Bolton Market Building, KDA Bungalow and Main Bank Building, I.I. Chundrigar Road, Karachi

7 days left

karachi·Ministry of Finance

AuctionPosted 24-Jun-2026PPRA FederalCloses 13-Jul-2026
🏗️

Reconstruction of National Highway N-5 under Pakistan’s Resilient Recovery, Rehabilitation and Reconstruction Framework Project–Phase I-A (141 KM), Section-8: Nowshera–Peshawar Road (31 KM)

Active

islamabad·Ministry of Communications

WorksPosted 23-Jun-2026PPRA FederalCloses 21-Jul-2026
🏗️

CONTRACT FOR OPERATION & MAINTENANCE OF COMPLETE FIRE FIGHTING SYSTEM WITH ALLIED ACCESSORIES AT NBP G5/1 BUILDING ISLAMABAD (CONTRACT DURATION THREE YEARS)

10 days left

karachi·National Bank of Pakistan (NBP)

GoodsPosted 23-Jun-2026PPRA FederalCloses 16-Jul-2026