General guidance on common causes of rejection. The exact grounds are set by the procurement rules and the bidding document for each tender, which always govern.
The Short Answer
Most bids that are rejected fail on paperwork, not price. A bid that does not meet the requirements of the bidding document is treated as a non-responsive bid and is not evaluated further. The reliable way to avoid this is to turn the bidding document into a checklist and tick every line before you submit.
Missing or Wrong Bid Security
If the tender requires bid security, it must be in the stated form, for the stated amount, in favour of the right party, and valid for the stated period. A security of the wrong type, the wrong amount or one that expires too early is a common reason for rejection.
Missing Required Documents
- Registration certificates the notice asks for (for example PEC or tax registration).
- Experience statements and completion certificates in the format requested.
- Financial statements, affidavits or undertakings listed in the document.
- Signed and stamped forms, where the bidding document requires them.
Late or Wrongly Submitted Bids
Bids received after the deadline are not accepted. A bid sent to the wrong address, in the wrong number of envelopes, or through the wrong channel can also be refused. Confirm the submission method, the time, and whether a corrigendum has changed either.
Not Meeting Eligibility or Technical Criteria
Bids are checked against the criteria published in the bidding document during technical evaluation. If you do not meet a stated requirement, such as experience, equipment or specifications, you can be declared non-responsive even if your price is the lowest.
Price Presentation Errors
In the financial evaluation, errors in the price schedule, inconsistent figures, or treating taxes differently from what the document asks can cause problems. Follow the price format exactly and check your arithmetic.
Before You Submit
- Read the whole bidding document, not only the notice.
- Build a checklist of every document, form and signature it asks for.
- Check the deadline and submission method again on the day.
- Have someone who did not prepare the bid review it against the checklist.
Our bidding checklist can help you get started. If you think a bid was rejected unfairly, the grievance process in the applicable procurement rules and bidding document explains how to complain, and the time limits are short.
FAQs
What makes a bid non-responsive?
A bid is non-responsive when it materially fails to meet the bidding document, for example a missing bid security, a missing required document or a late submission.
Can I be rejected even if my price is the lowest?
Yes. Bids are checked against eligibility and technical requirements first. A bid that fails them can be rejected regardless of price.
What can I do if I think my bid was rejected unfairly?
The procurement rules and the bidding document describe a grievance process with short time limits. Read them as soon as you receive the evaluation result.